City Projects
Contractors and Developers
Information about bidding on City projects and City project RFP's can be found on the City Purchasing Department webpage.
Documents such as Meridian Supplementary Specifications, Standard Drawings, and Construction Stormwater management plan can be found on the Developer Resources page.
Current City Projects
Many City utility projects are constructed in conjunction with Ada County Highway District (ACHD) road projects. This saves Meridian taxpayers money and reduces impacts to traffic. For questions specifically about how the road will be changed by joint projects (number of lanes, sidewalks, etc), please contact ACHD.
For more information on construction related road closures click here.
Project
|
Description
|
Project Manager
|
Est. Start Date
|
| Split Corridor Phase 2 |
Install water/sewer in conjunction with ACHD project |
Tim Curns |
October 2012 |
| Well 15 Evaluation |
Evaluation of Well 15 |
Tim Curns |
December 2012 |
| NW 1st Street Waterline Replacement |
Replace the water main, a fire hydrant and three water services between Pine St and Meridian Elementary School |
Brent Blake |
Coinciding with out of school schedule. |
| Well 10b Pumping Facilities |
Construct a new masonry well house and associated pump, motor, VFD and operating controls |
Brent Blake |
Mid-August 2012 |
| Well 24 Flush Line Construction |
Construct approximately 100 ft of water main across Linder Rd just south of Ustick Rd, to flush Well #24 into Five Mile Creek |
Brent Blake |
2013 |
| WWTP RAS Reconfiguration |
Rerouting the return activated sludge stream to control filaments at the Wastewater Plant and improve operation of the secondary treatment system |
Clint Dolsby |
July 2012 |
| WWTP Fermentation and Odor Control |
Construction of an expandable odor control system and facilities to create volatile fatty acids and increase the nutrient removal capabilities of the biological system |
Clint Dolsby |
January or February 2013 |
| Pressure Zone 1 - Pressure Reducing Valves |
Creating a new pressure zone 1 with the installation of pressure reducing valves (PRVs) |
Clint Worthington |
Fall 2012 |
| Ground Reservoir #2 |
Construction of an above ground water storage tank and booster pumps |
Clint Worthington |
Spring 2013 |
| Well 21-Iron and Manganese Treatment |
Adding filters to remove iron and manganese from the drinking water |
Clint Worthington |
Spring 2013 |
| Black Cat Flush Line |
Construction of a water system flush line |
Clint Worthington |
Spring 2013 |
| WWTP Chemical Feed Building |
Construction of new chemical feed building at WWTP |
David Allison |
June 2012 |
| WWTP Flocculation Tanks |
Design and construction of new flocculation tanks |
David Allison |
Summer 2012 |
| WWTP Administration Building and Existing Administration Building Remodel |
Design and construction of a new administration building and the remodel and conversion of the existing administration building |
David Allison |
Fall 2012 |
| WWTP Laboratory Expansion |
Design and construction of a new laboratory building to meet new and updated testing requirements at the WWTP |
David Allison |
Fall 2012 |
| Well 17 Upgrades |
Upgrades to the existing pump and pumping facilities at Well 17 |
David Allison |
Fall 2012 |
| Sewer Line Replacement Site 13 |
Replacement of sewer in the alley from Main to Meridian between King and Ada |
John Boyd |
Fall 2012 |
| 8th Street Sewer Trunkline |
Install trunkline in 8th Street from Cherry to Carlton. Phase 1 of a three phase project to be completed in 2015 |
John Boyd |
Summer 2013 |
| Ten Mile / Ustick Intersection in conjunction with ACHD Project |
Installing reuse mains west of intersection limits and lowering existing water mains due to conflicts |
John Boyd |
Substantially complete
|
| Franklin - Ten Mile to Linder |
Installation of reuse main and sewer main with ACHD project |
John Boyd |
Winter 2012/ Spring 2013 |
updated December 4, 2012